Project implementation

In an energy storage project, the work of designers, subcontractors, manufacturers and other stakeholders must be coordinated within a single schedule. We manage the project from construction right through to successful commissioning.

What does the service involve?

1

Construction management

We organise, schedule and continuously supervise on-site construction and installation work, from crane operations to cabling.

2

Commissioning

We will commission the energy storage system, the PCS, the MV Skid and the SCADA system, and carry out the aFRR and FCR accreditation tests.

3

Control systems integration

We integrate the control and monitoring systems into the existing site infrastructure using Modbus, IEC 104 and IEC 61850 protocols.

4

Quality and Safety Control

We continuously check that the work carried out complies with the relevant technical standards, fire safety regulations and mains supply requirements.

GNX project coordination

In an energy storage project, the work of several parties needs to be co-ordinated simultaneously. GNX brings them all together as a single point of contact, so the client does not need to liaise between the parties.

Investment and construction chain

  • Developer / owner
  • Contractors and subcontractors
  • Designers
  • Insurer / technical supervisor
  • Equipment manufacturers

Network and regulatory environment

  • Distribution network licence holder
  • Licensing authorities
  • System operator (MAVIR)
  • Aggregator / balance group manager
  • Operations team
  • Accreditation and certification bodies

Why is commissioning the most critical stage?

An energy storage system only generates revenue if the grid, accreditation and control conditions are all met simultaneously. We manage these not at the time of handover, but right from the planning stage.

Grid Constraints


Limits on feed-in, withdrawal, and ramp rates; closed-loop control at the point of interconnection; and reverse power protection.

Accreditation Testing


aFRR and FCR testing across the full charge/discharge range, including the determination of actual capacity.

Multi-Party Integration


Protocol conversion (Modbus, IEC 104, IEC 61850) and the interconnection of multiple IP networks across the systems of different stakeholders.

Hybrid Systems


Managing the operational requirements for a shared point of interconnection with solar farms, wind power plants, or gas engines.

Where we have already proven ourselves

CHECK OUT THE REFERENCES

Handover does not mark the end of the project

Our aim is to continuously protect and support our clients’ investments for up to 10 years after construction, through manufacturer-level maintenance and operation.
Find out more about the O&M service