- A combination of an energy storage system—with a capacity of 20 MW and 40 MWh—and a solar power system, located at the MOL Tiszaújváros Energy Storage Power Plant site.
- Storage of surplus solar energy, making the power available for use at a later time.
- A system with aFRR accreditation, providing frequency regulation services.
- Support for flexible energy supply and grid stability, adapted to changing demands.
- The objective is to reduce the carbon dioxide emissions of MOL MPK and increase the flexibility of the energy grid.
Our Activities
During the implementation of the project, we ensure the procurement and delivery of the main technological equipment (BESS, MV Skid, SCADA), as well as system design, permitting, construction, and full-scale commissioning of the system. This includes the integration of control systems, followed by the execution of maintenance tasks—at a manufacturer-standard level—to ensure long-term operational reliability.
Our partners
- BYD
- NR Electric

- Eine Kombination aus einem 20-MW-/40-MWh-Energiespeichersystem und einer Solaranlage at MOL-Standort Algyő.
- Das erste Energieprojekt in Ungarn, das Lösungs von CATL und NR Electric meedinander kombiniter.
- Speicherung von überschüssigem Solarstrom, um die Energie zu einem späteren Einstellung nutzbar zu machen.
- Ein System mit aFRR-Zertifizierung, das Dienstleistungen zur Frequenzregelung erbringt.
- Unterstützung einer flexiblen Energieversorgung und der Netzstabilität, adapted to the changing requirements.
- Ziel ist es, zur Ringringerung der Kohlendioxidemissionen von MOL beizutragen und die Flexibility des Energienetzes zu einchen.
Our Activities
During the implementation of the project, we ensure the procurement and delivery of the main control equipment (MV Skid, SCADA), the full-scale commissioning of the system, the integration of the control systems, and—to guarantee long-term operational reliability—the execution of maintenance tasks at an OEM (manufacturer) level.
Our partners
- NR Electric

- An energy storage system with a power output of 10 MW and a capacity of 20 MWh, installed at Alteo’s site in Bana.
- The project aims to utilize energy storage capacity at the grid level; thanks to aFRR accreditation, the system can automatically perform the specified functions—with a response time measured in seconds—to help stabilize grid frequency.
- A key pillar of ALTEO’s long-term sustainability and energy storage strategy.
- Hybrid system – The energy storage unit was installed alongside a wind power plant.
Our Activities
During the implementation of the project, we ensure the procurement and delivery of the main technological equipment (BESS, MV Skid, SCADA), as well as system design, permitting, construction, and full-scale commissioning of the system. This includes the integration of control systems, followed by the execution of maintenance tasks—at a manufacturer-standard level—to ensure long-term operational reliability.
Our partners
- BYD
- NR Electric

- An energy storage system with a power output of 10 MW and a capacity of 20 MWh, installed at Alteo’s site in Győr.
- The project aims to utilize energy storage capacity at the grid level; thanks to aFRR accreditation, the system can automatically perform the specified functions—with a response time measured in seconds—to help stabilize grid frequency.
- A key pillar of ALTEO’s long-term sustainability and energy storage strategy.
- Hybrid system – The energy storage unit was installed alongside a thermal power plant.
Our Activities
During the implementation of the project, we ensure the procurement and delivery of the main technological equipment (BESS, MV Skid, SCADA), as well as system design, permitting, construction, and full-scale commissioning of the system. This includes the integration of control systems, followed by the execution of maintenance tasks—at a manufacturer-standard level—to ensure long-term operational reliability.
Our partners
- BYD
- NR Electric

- Power and capacity: 5 MW/13.044 MWh energy storage system featuring advanced LiFePO₄ technology.
- aFRR accreditation: automatic intervention with a sub-second response time to stabilize grid frequency.
- Integration of renewable energy sources: a more balanced and efficient energy supply.
- Increased energy efficiency in the region and reduced strain on local infrastructure.
- Achievement of an 83.5% energy conversion efficiency.
- Independent, commercial-scale operation at the Adige Solar site.
Our Activities
During the implementation of the project, we ensure the procurement and delivery of the main technological equipment (BESS, MV Skid, SCADA), system design, construction, and full-scale commissioning of the system, as well as the integration of control systems; furthermore, to guarantee long-term operational reliability, we carry out maintenance activities at an OEM (manufacturer) level.
Our partners
- BYD
- NR Electric

- Installation of energy storage systems with a total capacity of nearly 20 MWh across 6 sites managed by Greenergy.
- Project objective: To utilize energy storage capacity at the grid level—with a specific focus on aFRR (automatic Frequency Restoration Reserve) accreditation—enabling the system to automatically contribute to grid frequency stabilization with a response time measured in seconds.
- Hybrid systems: Tailored hybrid configurations for each site, integrating energy storage systems (BESS) with solar farms, wind turbines, or gas engines.
- Combining these technologies helps balance the weather-dependent nature of renewable energy sources, while ensuring continuous energy security and flexible energy management.
- A unique solution in Hungary: an energy storage system connected on the DC side, which allows for the utilization of the solar power plant’s full DC capacity.
Our Activities
During the implementation of the project, we ensured the procurement and delivery of battery energy storage systems (BESS) and power conversion systems (PCS), as well as the commissioning of the technological equipment following the completion of construction works.
Our partners
- BYD
- NR Electric

- Installation of energy storage systems with a total capacity of nearly 20 MWh across 6 sites managed by Greenergy.
- Project objective: To utilize energy storage capacity at the grid level—with a specific focus on aFRR (automatic Frequency Restoration Reserve) accreditation—enabling the system to automatically contribute to grid frequency stabilization with a response time measured in seconds.
- Hybrid systems: Tailored hybrid configurations for each site, integrating energy storage systems (BESS) with solar farms, wind turbines, or gas engines.
- Combining these technologies helps balance the weather-dependent nature of renewable energy sources, while ensuring continuous energy security and flexible energy management.
- A unique solution in Hungary: an energy storage system connected on the DC side, which allows for the utilization of the solar power plant’s full DC capacity.
Our Activities
During the implementation of the project, we ensured the procurement and delivery of battery energy storage systems (BESS) and power conversion systems (PCS), as well as the commissioning of the technological equipment following the completion of construction works.
Our partners
- BYD
- NR Electric

- Installation of energy storage systems with a total capacity of nearly 20 MWh across 6 sites managed by Greenergy.
- Project objective: To utilize energy storage capacity at the grid level—with a specific focus on aFRR (automatic Frequency Restoration Reserve) accreditation—enabling the system to automatically contribute to grid frequency stabilization with a response time measured in seconds.
- Hybrid systems: Tailored hybrid configurations for each site, integrating energy storage systems (BESS) with solar farms, wind turbines, or gas engines.
- Combining these technologies helps balance the weather-dependent nature of renewable energy sources, while ensuring continuous energy security and flexible energy management.
- A unique solution in Hungary: an energy storage system connected on the DC side, which allows for the utilization of the solar power plant’s full DC capacity.
Our Activities
During the implementation of the project, we ensured the procurement and delivery of battery energy storage systems (BESS) and power conversion systems (PCS), as well as the commissioning of the technological equipment following the completion of construction works.
Our partners
- BYD
- NR Electric

- Installation of energy storage systems with a total capacity of nearly 20 MWh across 6 sites managed by Greenergy.
- Project objective: To utilize energy storage capacity at the grid level—with a specific focus on aFRR (automatic Frequency Restoration Reserve) accreditation—enabling the system to automatically contribute to grid frequency stabilization with a response time measured in seconds.
- Hybrid systems: Tailored hybrid configurations for each site, integrating energy storage systems (BESS) with solar farms, wind turbines, or gas engines.
- Combining these technologies helps balance the weather-dependent nature of renewable energy sources, while ensuring continuous energy security and flexible energy management.
- A unique solution in Hungary: an energy storage system connected on the DC side, which allows for the utilization of the solar power plant’s full DC capacity.
Our Activities
During the implementation of the project, we ensured the procurement and delivery of battery energy storage systems (BESS) and power conversion systems (PCS), as well as the commissioning of the technological equipment following the completion of construction works.
Our partners
- BYD
- NR Electric

- Installation of energy storage systems with a total capacity of nearly 20 MWh across 6 sites managed by Greenergy.
- Project objective: To utilize energy storage capacity at the grid level—with a specific focus on aFRR (automatic Frequency Restoration Reserve) accreditation—enabling the system to automatically contribute to grid frequency stabilization with a response time measured in seconds.
- Hybrid systems: Tailored hybrid configurations for each site, integrating energy storage systems (BESS) with solar farms, wind turbines, or gas engines.
- Combining these technologies helps balance the weather-dependent nature of renewable energy sources, while ensuring continuous energy security and flexible energy management.
- A unique solution in Hungary: an energy storage system connected on the DC side, which allows for the utilization of the solar power plant’s full DC capacity.
Our Activities
During the implementation of the project, we ensured the procurement and delivery of battery energy storage systems (BESS) and power conversion systems (PCS), as well as the commissioning of the technological equipment following the completion of construction works.
Our partners
- BYD
- NR Electric

- Installation of energy storage systems with a total capacity of nearly 20 MWh across 6 sites managed by Greenergy.
- Project objective: To utilize energy storage capacity at the grid level—with a specific focus on aFRR (automatic Frequency Restoration Reserve) accreditation—enabling the system to automatically contribute to grid frequency stabilization with a response time measured in seconds.
- Hybrid systems: Tailored hybrid configurations for each site, integrating energy storage systems (BESS) with solar farms, wind turbines, or gas engines.
- Combining these technologies helps balance the weather-dependent nature of renewable energy sources, while ensuring continuous energy security and flexible energy management.
- A unique solution in Hungary: an energy storage system connected on the DC side, which allows for the utilization of the solar power plant’s full DC capacity.
Our Activities
During the implementation of the project, we ensured the procurement and delivery of battery energy storage systems (BESS) and power conversion systems (PCS), as well as the commissioning of the technological equipment following the completion of construction works.
Our partners
- BYD
- NR Electric

- The combined system installed in Kiskunfélegyháza has been integrated into Greenergy’s proprietary aggregation software.
- Project objective: To utilize energy storage capacity at the grid level—with a particular focus on aFRR accreditation—enabling the system to automatically contribute to grid frequency stabilization with a response time measured in seconds.
- This is the first BYD containerized energy storage facility in Hungary.
- Grid connection is facilitated by SMA hybrid inverters and a total of six SMA DC/DC converters.
- The hybrid system—combining solar power generation with energy storage—connects to the electricity grid via a grid connection point with a nominal capacity of 4 MW.
Our Activities
During the implementation of the project, we ensured the procurement and delivery of the Battery Energy Storage System (BESS) and the Power Conversion System (PCS), as well as the commissioning of the technological equipment following the completion of the construction works.
Our partners
- BYD
- SMA

- The combined system installed in Kiskunfélegyháza has been integrated into Greenergy’s proprietary aggregation software.
- Project objective: To utilize energy storage capacity at the grid level—with a specific focus on aFRR (automatic Frequency Restoration Reserve) accreditation—enabling the system to automatically contribute to grid frequency stabilization with a response time measured in seconds.
- Hybrid system: The energy storage unit is installed at the same grid connection point as a small gas-engine power plant. The two systems operate in a complementary, rather than simultaneous, manner, allowing for more efficient utilization of the connection point.
- The operation of the energy storage unit and the gas engine can be flexibly adjusted to meet grid requirements, thereby increasing the volume of energy that can be fed into or drawn from the grid at that connection point.
- Energy storage solution: 1 BYD Cube Pro energy storage unit, KSTAR inverter (PCS).
Our Activities
During the implementation of the project, we ensured the procurement and delivery of the Battery Energy Storage System (BESS) and the Power Conversion System (PCS), as well as the commissioning of the technological equipment following the completion of the construction works.
Our partners
- BYD
- Kstar

- An energy storage system with a total capacity of over 2.9 MWh is being installed across three sites, alongside the expansion of existing solar power systems.
- The development aims to increase the share of on-site, renewable-based energy generation, which already covers more than 60% of operational requirements.
- The commercial utilization of the energy storage systems further enhances the economic return on the investment.
- The project was implemented through a customized design, taking into account Terrán’s consumption patterns, site-specific conditions, and the economic environment.
- The development contributes to a sustainable, stable, and cost-effective energy supply for manufacturing processes.
Our Activities
Based on our energy and economic analyses, we first validated the investment. During the project’s implementation, we manage the procurement and delivery of key technological equipment, system design, permitting, construction, and full-scale commissioning of the system, as well as the integration of control systems. Furthermore, to ensure long-term operational reliability and system optimization, we carry out maintenance and operational tasks.
Our partners
- Tecloman

- An energy storage system with a total capacity of over 2.9 MWh is being installed across three sites, alongside the expansion of existing solar power systems.
- The development aims to increase the share of on-site, renewable-based energy generation, which already covers more than 60% of operational requirements.
- The commercial utilization of the energy storage systems further enhances the economic return on the investment.
- The project was implemented through a customized design, taking into account Terrán’s consumption patterns, site-specific conditions, and the economic environment.
- The development contributes to a sustainable, stable, and cost-effective energy supply for manufacturing processes.
Our Activities
Based on our energy and economic analyses, we first validated the investment. During the project’s implementation, we manage the procurement and delivery of key technological equipment, system design, permitting, construction, and full-scale commissioning of the system, as well as the integration of control systems. Furthermore, to ensure long-term operational reliability and system optimization, we carry out maintenance and operational tasks.
Our partners
- Tecloman

- An energy storage system with a total capacity of over 2.9 MWh is being installed across three sites, alongside the expansion of existing solar power systems.
- The development aims to increase the share of on-site, renewable-based energy generation, which already covers more than 60% of operational requirements.
- The commercial utilization of the energy storage systems further enhances the economic return on the investment.
- The project was implemented through a customized design, taking into account Terrán’s consumption patterns, site-specific conditions, and the economic environment.
- The development contributes to a sustainable, stable, and cost-effective energy supply for manufacturing processes.
Our Activities
Based on our energy and economic analyses, we first validated the investment. During the project’s implementation, we manage the procurement and delivery of key technological equipment, system design, permitting, construction, and full-scale commissioning of the system, as well as the integration of control systems. Furthermore, to ensure long-term operational reliability and system optimization, we carry out maintenance and operational tasks.
Our partners
- Tecloman

- Expansion of the existing solar power system’s capacity, tailored to the hotel’s energy requirements.
- The expansion underwent technical and economic validation, supported by a detailed analysis of energy consumption and production.
- Installation of an energy storage system for energy management purposes, designed to utilize surplus generated energy.
- The energy storage system facilitates on-site energy consumption during evening hours and peak periods.
- A significant increase in self-consumption, which reduces reliance on energy from the grid.
- The investment contributes to the hotel’s sustainability and carbon reduction goals.
- The development enhances the “green” image the hotel aims to cultivate.
- The GNX intelligent control system optimizes energy production and consumption.
Our Activities
Based on our energy and economic analyses, and taking user requirements into account, we determined the appropriate size for the renewable energy generation plant. This included defining the optimal system, as well as long-term system operation and performance optimization, facilitated by our proprietary communication systems and software.
Our partners
- Tecloman

- An electrical energy storage system with a power output of 21 MW and a capacity of 48 MWh is being established in the Transdanubian region of Hungary.
- The system supports the expansion of a 49.99 MW solar power plant.
- This state-of-the-art system is based on LiFePO₄ battery technology, which ensures a long service life and a high level of operational safety.
- Grid connection is provided by two 22 kV cable systems, linked directly to the switching station.
- The installation includes 12 BYD energy storage containers, 3 MV SKID transformer stations, and 1 AUX SKID auxiliary transformer station.
Our Activities
During the implementation of the project, we ensure the procurement and delivery of the main technological equipment (BESS, MV Skid, SCADA), system design, full-scale commissioning, and the integration of control systems. To guarantee long-term operational reliability, we also undertake the execution of maintenance tasks at an OEM (manufacturer) level.
Our partners
- BYD
- NR Electric

- Installation of an energy storage system with a power output of 3 MW and a capacity of 12 MWh at the Hajdúböszörmény site.
- Project objective – Grid-level utilization of energy storage capacity, with a particular focus on aFRR accreditation, enabling the system to automatically contribute to grid frequency stabilization with a response time measured in seconds.
- Hybrid system – The energy storage equipment was installed alongside an existing solar PV system.
- Energy storage solution – BYD MC Cube T (2 containers, 2 PCS units + SCADA)
Our Activities
This is the first project for GNX Engineering in which the company participated not merely as a technology supplier, but also by executing the actual construction workflows. In this capacity, GNX Engineering provided a full-scope service, covering everything from system design to commissioning. The BYD MC Cube-T solution was installed alongside an existing solar power system.
Our partners
- BYD
- NR Electric

Our partners
- BYD
- NR Electric

Our partners
- BYD
- NR Electric

Our partners
- Hoymiles

Our partners
- Hoymiles

Our partners
- Hoymiles

Our partners
- Hoymiles

Our partners
- Hoymiles
Our partners
- Hoymiles
Our partners
- Hoymiles

Our partners
- Hoymiles

- Total 192 kWp DC solar capacity.
- The solar system installed on the roof of the office building is designed to generate the green energy required for the facility’s operations on-site.
- 3 x 50 kWp Huawei inverters.
- Smart electric vehicle charging system with 6 x 22 kW capacity.
- Implemented under an on-site PPA (Power Purchase Agreement) structure.
- Délép Industrial Park
Our Activities
Based on our energy and economic analysis, we first validated the investment. During project implementation, we handle the procurement and delivery of key technological equipment, system design, permitting, construction, and full-scale commissioning, as well as the integration of control systems. To ensure long-term operational reliability, we also carry out maintenance tasks to the standard of the original equipment manufacturer. During the operational phase, we provide remote monitoring via a smart communication box.
Our partners
- Hoymiles

Our partners
- Tecloman
Our partners
- Hoymiles
Our partners
- Hoymiles
Our partners
- BYD
- NR Electric
Our partners
- BYD
- NR Electric
Our partners
- BYD
- NR Electric
Our partners
- BYD
- NR Electric
Our partners
- BYD
- NR Electric
Our partners
- BYD
- NR Electric
Our partners
- BYD
- NR Electric
Our partners
- BYD
- NR Electric
Our partners
- BYD
- NR Electric

- Total 165 kWp DC solar capacity.
- The solar power system installed on the roof of the office building is designed to generate the green energy required for the facility’s operations on-site.
- 3 x 50 kWp Huawei inverters.
- Smart electric vehicle charging system with 8 x 22 kW units.
- Installation and programming of a smart communication expansion module.
- Location: KÉSZ Group’s office building in Budapest.
Our Activities
As a first step, we validated the investment based on our energy and economic analysis. During project implementation, we manage the procurement and delivery of key technological equipment, system design, permitting, construction, and full-scale commissioning, as well as the integration of control systems. Furthermore, to ensure long-term operational reliability, we carry out maintenance tasks to the standard of the original equipment manufacturer. During the operational phase, we provide remote monitoring via a smart communication box.