Orders:
Energy storage capacity:
Number of power plants:
Technology
Connected power plant
Megújuló alapú, tárolós erőművi rendszer
About the project
Tiszaújváros 2025
LFP PV
  • A combination of an energy storage system—with a capacity of 20 MW and 40 MWh—and a solar power system, located at the MOL Tiszaújváros Energy Storage Power Plant site.
  • Storage of surplus solar energy, making the power available for use at a later time.
  • A system with aFRR accreditation, providing frequency regulation services.
  • Support for flexible energy supply and grid stability, adapted to changing demands.
  • The objective is to reduce the carbon dioxide emissions of MOL MPK and increase the flexibility of the energy grid.

Our Activities

During the implementation of the project, we ensure the procurement and delivery of the main technological equipment (BESS, MV Skid, SCADA), as well as system design, permitting, construction, and full-scale commissioning of the system. This includes the integration of control systems, followed by the execution of maintenance tasks—at a manufacturer-standard level—to ensure long-term operational reliability.

Our partners

  • BYD
  • NR Electric
28 000 kW
Performance
46 590 kWh
Capacity
Megújuló alapú, tárolós erőművi rendszer
MOL – Algyő
About the project
Algyő 2025
LFP PV
  • Eine Kombination aus einem 20-MW-/40-MWh-Energiespeichersystem und einer Solaranlage at MOL-Standort Algyő.
  • Das erste Energieprojekt in Ungarn, das Lösungs von CATL und NR Electric meedinander kombiniter.
  • Speicherung von überschüssigem Solarstrom, um die Energie zu einem späteren Einstellung nutzbar zu machen.
  • Ein System mit aFRR-Zertifizierung, das Dienstleistungen zur Frequenzregelung erbringt.
  • Unterstützung einer flexiblen Energieversorgung und der Netzstabilität, adapted to the changing requirements.
  • Ziel ist es, zur Ringringerung der Kohlendioxidemissionen von MOL beizutragen und die Flexibility des Energienetzes zu einchen.

Our Activities

During the implementation of the project, we ensure the procurement and delivery of the main control equipment (MV Skid, SCADA), the full-scale commissioning of the system, the integration of the control systems, and—to guarantee long-term operational reliability—the execution of maintenance tasks at an OEM (manufacturer) level.

Our partners

  • NR Electric
28 000 kW
Performance
Megújuló alapú, tárolós erőművi rendszer
Alteo Bana
About the project
Bana 2025
LFP Wind
  • An energy storage system with a power output of 10 MW and a capacity of 20 MWh, installed at Alteo’s site in Bana.
  • The project aims to utilize energy storage capacity at the grid level; thanks to aFRR accreditation, the system can automatically perform the specified functions—with a response time measured in seconds—to help stabilize grid frequency.
  • A key pillar of ALTEO’s long-term sustainability and energy storage strategy.
  • Hybrid system – The energy storage unit was installed alongside a wind power plant.

Our Activities

During the implementation of the project, we ensure the procurement and delivery of the main technological equipment (BESS, MV Skid, SCADA), as well as system design, permitting, construction, and full-scale commissioning of the system. This includes the integration of control systems, followed by the execution of maintenance tasks—at a manufacturer-standard level—to ensure long-term operational reliability.

Our partners

  • BYD
  • NR Electric
12 250 kW
Performance
26 089 kWh
Capacity
Megújuló alapú, tárolós erőművi rendszer
Alteo Therm
About the project
Győr 2025
LFP Gas engine
  • An energy storage system with a power output of 10 MW and a capacity of 20 MWh, installed at Alteo’s site in Győr.
  • The project aims to utilize energy storage capacity at the grid level; thanks to aFRR accreditation, the system can automatically perform the specified functions—with a response time measured in seconds—to help stabilize grid frequency.
  • A key pillar of ALTEO’s long-term sustainability and energy storage strategy.
  • Hybrid system – The energy storage unit was installed alongside a thermal power plant.

Our Activities

During the implementation of the project, we ensure the procurement and delivery of the main technological equipment (BESS, MV Skid, SCADA), as well as system design, permitting, construction, and full-scale commissioning of the system. This includes the integration of control systems, followed by the execution of maintenance tasks—at a manufacturer-standard level—to ensure long-term operational reliability.

Our partners

  • BYD
  • NR Electric
12 250 kW
Performance
26 089 kWh
Capacity
Megújuló alapú, tárolós erőművi rendszer
Adige BESS Plant
About the project
Tiszakécske 2025
LFP PV
  • Power and capacity: 5 MW/13.044 MWh energy storage system featuring advanced LiFePO₄ technology.
  • aFRR accreditation: automatic intervention with a sub-second response time to stabilize grid frequency.
  • Integration of renewable energy sources: a more balanced and efficient energy supply.
  • Increased energy efficiency in the region and reduced strain on local infrastructure.
  • Achievement of an 83.5% energy conversion efficiency.
  • Independent, commercial-scale operation at the Adige Solar site.

Our Activities

During the implementation of the project, we ensure the procurement and delivery of the main technological equipment (BESS, MV Skid, SCADA), system design, construction, and full-scale commissioning of the system, as well as the integration of control systems; furthermore, to guarantee long-term operational reliability, we carry out maintenance activities at an OEM (manufacturer) level.

Our partners

  • BYD
  • NR Electric
5 000 kW
Performance
13 045 kWh
Capacity
Megújuló alapú, tárolós erőművi rendszer
Greenergy – Paks I.
About the project
Paks 2025
LFP PV
  • Installation of energy storage systems with a total capacity of nearly 20 MWh across 6 sites managed by Greenergy.
  • Project objective: To utilize energy storage capacity at the grid level—with a specific focus on aFRR (automatic Frequency Restoration Reserve) accreditation—enabling the system to automatically contribute to grid frequency stabilization with a response time measured in seconds.
  • Hybrid systems: Tailored hybrid configurations for each site, integrating energy storage systems (BESS) with solar farms, wind turbines, or gas engines.
  • Combining these technologies helps balance the weather-dependent nature of renewable energy sources, while ensuring continuous energy security and flexible energy management.
  • A unique solution in Hungary: an energy storage system connected on the DC side, which allows for the utilization of the solar power plant’s full DC capacity.

Our Activities

During the implementation of the project, we ensured the procurement and delivery of battery energy storage systems (BESS) and power conversion systems (PCS), as well as the commissioning of the technological equipment following the completion of construction works.

Our partners

  • BYD
  • NR Electric
1 250 kW
Performance
5 591 kWh
Capacity
Megújuló alapú, tárolós erőművi rendszer
Greenergy – Paks II.
About the project
Paks 2025
LFP PV
  • Installation of energy storage systems with a total capacity of nearly 20 MWh across 6 sites managed by Greenergy.
  • Project objective: To utilize energy storage capacity at the grid level—with a specific focus on aFRR (automatic Frequency Restoration Reserve) accreditation—enabling the system to automatically contribute to grid frequency stabilization with a response time measured in seconds.
  • Hybrid systems: Tailored hybrid configurations for each site, integrating energy storage systems (BESS) with solar farms, wind turbines, or gas engines.
  • Combining these technologies helps balance the weather-dependent nature of renewable energy sources, while ensuring continuous energy security and flexible energy management.
  • A unique solution in Hungary: an energy storage system connected on the DC side, which allows for the utilization of the solar power plant’s full DC capacity.

Our Activities

During the implementation of the project, we ensured the procurement and delivery of battery energy storage systems (BESS) and power conversion systems (PCS), as well as the commissioning of the technological equipment following the completion of construction works.

Our partners

  • BYD
  • NR Electric
1 250 kW
Performance
5 591 kWh
Capacity
Megújuló alapú, tárolós erőművi rendszer
Greenergy – Budapest
About the project
Budapest 2025
LFP PV
  • Installation of energy storage systems with a total capacity of nearly 20 MWh across 6 sites managed by Greenergy.
  • Project objective: To utilize energy storage capacity at the grid level—with a specific focus on aFRR (automatic Frequency Restoration Reserve) accreditation—enabling the system to automatically contribute to grid frequency stabilization with a response time measured in seconds.
  • Hybrid systems: Tailored hybrid configurations for each site, integrating energy storage systems (BESS) with solar farms, wind turbines, or gas engines.
  • Combining these technologies helps balance the weather-dependent nature of renewable energy sources, while ensuring continuous energy security and flexible energy management.
  • A unique solution in Hungary: an energy storage system connected on the DC side, which allows for the utilization of the solar power plant’s full DC capacity.

Our Activities

During the implementation of the project, we ensured the procurement and delivery of battery energy storage systems (BESS) and power conversion systems (PCS), as well as the commissioning of the technological equipment following the completion of construction works.

Our partners

  • BYD
  • NR Electric
1 250 kW
Performance
2 795 kWh
Capacity
Megújuló alapú, tárolós erőművi rendszer
Greenenergy – Mezőtúr
About the project
Mezőtúr 2025
LFP PV
  • Installation of energy storage systems with a total capacity of nearly 20 MWh across 6 sites managed by Greenergy.
  • Project objective: To utilize energy storage capacity at the grid level—with a specific focus on aFRR (automatic Frequency Restoration Reserve) accreditation—enabling the system to automatically contribute to grid frequency stabilization with a response time measured in seconds.
  • Hybrid systems: Tailored hybrid configurations for each site, integrating energy storage systems (BESS) with solar farms, wind turbines, or gas engines.
  • Combining these technologies helps balance the weather-dependent nature of renewable energy sources, while ensuring continuous energy security and flexible energy management.
  • A unique solution in Hungary: an energy storage system connected on the DC side, which allows for the utilization of the solar power plant’s full DC capacity.

Our Activities

During the implementation of the project, we ensured the procurement and delivery of battery energy storage systems (BESS) and power conversion systems (PCS), as well as the commissioning of the technological equipment following the completion of construction works.

Our partners

  • BYD
  • NR Electric
1 250 kW
Performance
2 795 kWh
Capacity
Megújuló alapú, tárolós erőművi rendszer
Lövő – AC Coupled Wind Plant
About the project
Lövő 2025
LFP PV
  • Installation of energy storage systems with a total capacity of nearly 20 MWh across 6 sites managed by Greenergy.
  • Project objective: To utilize energy storage capacity at the grid level—with a specific focus on aFRR (automatic Frequency Restoration Reserve) accreditation—enabling the system to automatically contribute to grid frequency stabilization with a response time measured in seconds.
  • Hybrid systems: Tailored hybrid configurations for each site, integrating energy storage systems (BESS) with solar farms, wind turbines, or gas engines.
  • Combining these technologies helps balance the weather-dependent nature of renewable energy sources, while ensuring continuous energy security and flexible energy management.
  • A unique solution in Hungary: an energy storage system connected on the DC side, which allows for the utilization of the solar power plant’s full DC capacity.

Our Activities

During the implementation of the project, we ensured the procurement and delivery of battery energy storage systems (BESS) and power conversion systems (PCS), as well as the commissioning of the technological equipment following the completion of construction works.

Our partners

  • BYD
  • NR Electric
1 250 kW
Performance
2 795 kWh
Capacity
Megújuló alapú, tárolós erőművi rendszer
Dunaharaszti – Coca Cola
About the project
Dunaharaszti 2025
LFP Gas engine
  • Installation of energy storage systems with a total capacity of nearly 20 MWh across 6 sites managed by Greenergy.
  • Project objective: To utilize energy storage capacity at the grid level—with a specific focus on aFRR (automatic Frequency Restoration Reserve) accreditation—enabling the system to automatically contribute to grid frequency stabilization with a response time measured in seconds.
  • Hybrid systems: Tailored hybrid configurations for each site, integrating energy storage systems (BESS) with solar farms, wind turbines, or gas engines.
  • Combining these technologies helps balance the weather-dependent nature of renewable energy sources, while ensuring continuous energy security and flexible energy management.
  • A unique solution in Hungary: an energy storage system connected on the DC side, which allows for the utilization of the solar power plant’s full DC capacity.

Our Activities

During the implementation of the project, we ensured the procurement and delivery of battery energy storage systems (BESS) and power conversion systems (PCS), as well as the commissioning of the technological equipment following the completion of construction works.

Our partners

  • BYD
  • NR Electric
1 250 kW
Performance
2 795 kWh
Capacity
Megújuló alapú, tárolós erőművi rendszer
Kiskunfélegyháza Ipari Park – DC Coupled PV Plant
About the project
Kiskunfélegyháza 2024
LFP PV
  • The combined system installed in Kiskunfélegyháza has been integrated into Greenergy’s proprietary aggregation software.
  • Project objective: To utilize energy storage capacity at the grid level—with a particular focus on aFRR accreditation—enabling the system to automatically contribute to grid frequency stabilization with a response time measured in seconds.
  • This is the first BYD containerized energy storage facility in Hungary.
  • Grid connection is facilitated by SMA hybrid inverters and a total of six SMA DC/DC converters.
  • The hybrid system—combining solar power generation with energy storage—connects to the electricity grid via a grid connection point with a nominal capacity of 4 MW.

Our Activities

During the implementation of the project, we ensured the procurement and delivery of the Battery Energy Storage System (BESS) and the Power Conversion System (PCS), as well as the commissioning of the technological equipment following the completion of the construction works.

Our partners

  • BYD
  • SMA
2 490 kW
Performance
5 180 kWh
Capacity
Megújuló alapú, tárolós erőművi rendszer
Kiskunfélegyháza Fűtőmű – AC Coupled Combined Heat & Power Plant
About the project
Kiskunfélegyháza 2024
LFP Gas engine
  • The combined system installed in Kiskunfélegyháza has been integrated into Greenergy’s proprietary aggregation software.
  • Project objective: To utilize energy storage capacity at the grid level—with a specific focus on aFRR (automatic Frequency Restoration Reserve) accreditation—enabling the system to automatically contribute to grid frequency stabilization with a response time measured in seconds.
  • Hybrid system: The energy storage unit is installed at the same grid connection point as a small gas-engine power plant. The two systems operate in a complementary, rather than simultaneous, manner, allowing for more efficient utilization of the connection point.
  • The operation of the energy storage unit and the gas engine can be flexibly adjusted to meet grid requirements, thereby increasing the volume of energy that can be fed into or drawn from the grid at that connection point.
  • Energy storage solution: 1 BYD Cube Pro energy storage unit, KSTAR inverter (PCS).

Our Activities

During the implementation of the project, we ensured the procurement and delivery of the Battery Energy Storage System (BESS) and the Power Conversion System (PCS), as well as the commissioning of the technological equipment following the completion of the construction works.

Our partners

  • BYD
  • Kstar
1 245 kW
Performance
2 590 kWh
Capacity
Megújuló alapú, tárolós erőművi rendszer
Terrán Bóly
About the project
Bóly 2025
LFP PV
  • An energy storage system with a total capacity of over 2.9 MWh is being installed across three sites, alongside the expansion of existing solar power systems.
  • The development aims to increase the share of on-site, renewable-based energy generation, which already covers more than 60% of operational requirements.
  • The commercial utilization of the energy storage systems further enhances the economic return on the investment.
  • The project was implemented through a customized design, taking into account Terrán’s consumption patterns, site-specific conditions, and the economic environment.
  • The development contributes to a sustainable, stable, and cost-effective energy supply for manufacturing processes.

Our Activities

Based on our energy and economic analyses, we first validated the investment. During the project’s implementation, we manage the procurement and delivery of key technological equipment, system design, permitting, construction, and full-scale commissioning of the system, as well as the integration of control systems. Furthermore, to ensure long-term operational reliability and system optimization, we carry out maintenance and operational tasks.

Our partners

  • Tecloman
630 kW
Performance
1 290 kWh
Capacity
Megújuló alapú, tárolós erőművi rendszer
Terrán Kunszentmiklós
About the project
Kunszentmiklós 2025
LFP PV
  • An energy storage system with a total capacity of over 2.9 MWh is being installed across three sites, alongside the expansion of existing solar power systems.
  • The development aims to increase the share of on-site, renewable-based energy generation, which already covers more than 60% of operational requirements.
  • The commercial utilization of the energy storage systems further enhances the economic return on the investment.
  • The project was implemented through a customized design, taking into account Terrán’s consumption patterns, site-specific conditions, and the economic environment.
  • The development contributes to a sustainable, stable, and cost-effective energy supply for manufacturing processes.

Our Activities

Based on our energy and economic analyses, we first validated the investment. During the project’s implementation, we manage the procurement and delivery of key technological equipment, system design, permitting, construction, and full-scale commissioning of the system, as well as the integration of control systems. Furthermore, to ensure long-term operational reliability and system optimization, we carry out maintenance and operational tasks.

Our partners

  • Tecloman
630 kW
Performance
1 290 kWh
Capacity
Megújuló alapú, tárolós erőművi rendszer
Terrán Pécs
About the project
Pécs 2025
LFP PV
  • An energy storage system with a total capacity of over 2.9 MWh is being installed across three sites, alongside the expansion of existing solar power systems.
  • The development aims to increase the share of on-site, renewable-based energy generation, which already covers more than 60% of operational requirements.
  • The commercial utilization of the energy storage systems further enhances the economic return on the investment.
  • The project was implemented through a customized design, taking into account Terrán’s consumption patterns, site-specific conditions, and the economic environment.
  • The development contributes to a sustainable, stable, and cost-effective energy supply for manufacturing processes.

Our Activities

Based on our energy and economic analyses, we first validated the investment. During the project’s implementation, we manage the procurement and delivery of key technological equipment, system design, permitting, construction, and full-scale commissioning of the system, as well as the integration of control systems. Furthermore, to ensure long-term operational reliability and system optimization, we carry out maintenance and operational tasks.

Our partners

  • Tecloman
150 kW
Performance
315 kWh
Capacity
Megújuló alapú, tárolós erőművi rendszer
FLOW Hotel
About the project
Inárcs 2025
LFP PV
  • Expansion of the existing solar power system’s capacity, tailored to the hotel’s energy requirements.
  • The expansion underwent technical and economic validation, supported by a detailed analysis of energy consumption and production.
  • Installation of an energy storage system for energy management purposes, designed to utilize surplus generated energy.
  • The energy storage system facilitates on-site energy consumption during evening hours and peak periods.
  • A significant increase in self-consumption, which reduces reliance on energy from the grid.
  • The investment contributes to the hotel’s sustainability and carbon reduction goals.
  • The development enhances the “green” image the hotel aims to cultivate.
  • The GNX intelligent control system optimizes energy production and consumption.

Our Activities

Based on our energy and economic analyses, and taking user requirements into account, we determined the appropriate size for the renewable energy generation plant. This included defining the optimal system, as well as long-term system operation and performance optimization, facilitated by our proprietary communication systems and software.

Our partners

  • Tecloman
500 kW
Performance
1 290 kWh
Capacity
Megújuló alapú, tárolós erőművi rendszer
Green Energy Investor BESS Plant
About the project
Paks 2025
LFP PV
  • An electrical energy storage system with a power output of 21 MW and a capacity of 48 MWh is being established in the Transdanubian region of Hungary.
  • The system supports the expansion of a 49.99 MW solar power plant.
  • This state-of-the-art system is based on LiFePO₄ battery technology, which ensures a long service life and a high level of operational safety.
  • Grid connection is provided by two 22 kV cable systems, linked directly to the switching station.
  • The installation includes 12 BYD energy storage containers, 3 MV SKID transformer stations, and 1 AUX SKID auxiliary transformer station.

Our Activities

During the implementation of the project, we ensure the procurement and delivery of the main technological equipment (BESS, MV Skid, SCADA), system design, full-scale commissioning, and the integration of control systems. To guarantee long-term operational reliability, we also undertake the execution of maintenance tasks at an OEM (manufacturer) level.

Our partners

  • BYD
  • NR Electric
21 000 kW
Performance
48 173 kWh
Capacity
Megújuló alapú, tárolós erőművi rendszer
Hajdúböszörmény BESS Plant
About the project
Hajdúböszörmény 2025
LFP PV
  • Installation of an energy storage system with a power output of 3 MW and a capacity of 12 MWh at the Hajdúböszörmény site.
  • Project objective – Grid-level utilization of energy storage capacity, with a particular focus on aFRR accreditation, enabling the system to automatically contribute to grid frequency stabilization with a response time measured in seconds.
  • Hybrid system – The energy storage equipment was installed alongside an existing solar PV system.
  • Energy storage solution – BYD MC Cube T (2 containers, 2 PCS units + SCADA)

Our Activities

This is the first project for GNX Engineering in which the company participated not merely as a technology supplier, but also by executing the actual construction workflows. In this capacity, GNX Engineering provided a full-scope service, covering everything from system design to commissioning. The BYD MC Cube-T solution was installed alongside an existing solar power system.

Our partners

  • BYD
  • NR Electric
3 500 kW
Performance
12 876 kWh
Capacity
Megújuló alapú, tárolós erőművi rendszer
Kecskemét Fémmunkás Ipari Park MMG
About the project
Kecskemét 2025
LFP PV

Our partners

  • BYD
  • NR Electric
1 575 kW
Performance
3 011 kWh
Capacity
Megújuló alapú, tárolós erőművi rendszer
Kecskemét Fémmunkás Ipari Park TRVZ
About the project
Kecskemét 2025
LFP PV

Our partners

  • BYD
  • NR Electric
1 575 kW
Performance
3 011 kWh
Capacity
Megújuló alapú, tárolós erőművi rendszer
CESI – Békés collocated BESS Plants
About the project
Békés 2026
LFP PV

Our partners

  • Hoymiles
2 880 kW
Performance
12 384 kWh
Capacity
Megújuló alapú, tárolós erőművi rendszer
CESI – Bácsalmás collocated BESS Plants
About the project
Bácsalmás 2026
LFP PV

Our partners

  • Hoymiles
1 440 kW
Performance
6 192 kWh
Capacity
Megújuló alapú, tárolós erőművi rendszer
CESI – Kalocsa collocated BESS Plants
About the project
Kalocsa 2026
LFP PV

Our partners

  • Hoymiles
960 kW
Performance
4 128 kWh
Capacity
Megújuló alapú, tárolós erőművi rendszer
CESI – Solt collocated BESS Plants
About the project
Solt 2026
LFP PV

Our partners

  • Hoymiles
2 400 kW
Performance
10 320 kWh
Capacity
Megújuló alapú, tárolós erőművi rendszer
Állatenyéztő telephely
About the project
Pusztacsó 2026
LFP PV

Our partners

  • Hoymiles
125 kW
Performance
261 kWh
Capacity
Megújuló alapú, tárolós erőművi rendszer
About the project
Kistokaj 2026
LFP PV

Our partners

  • Hoymiles
499 kW
Performance
1 044 kWh
Capacity
Megújuló alapú, tárolós erőművi rendszer
About the project
Székesfehérvár 2026
LFP PV

Our partners

  • Hoymiles
125 kW
Performance
261 kWh
Capacity
Megújuló alapú, tárolós erőművi rendszer
Orvostechnikai gyártóüzem
About the project
Veszprém 2026
LFP PV

Our partners

  • Hoymiles
125 kW
Performance
261 kWh
Capacity
Megújuló alapú, tárolós erőművi rendszer
INDUSTRIK Irodaház
About the project
Szeged 2024
SiB PV
  • Total 192 kWp DC solar capacity.
  • The solar system installed on the roof of the office building is designed to generate the green energy required for the facility’s operations on-site.
  • 3 x 50 kWp Huawei inverters.
  • Smart electric vehicle charging system with 6 x 22 kW capacity.
  • Implemented under an on-site PPA (Power Purchase Agreement) structure.
  • Délép Industrial Park

Our Activities

Based on our energy and economic analysis, we first validated the investment. During project implementation, we handle the procurement and delivery of key technological equipment, system design, permitting, construction, and full-scale commissioning, as well as the integration of control systems. To ensure long-term operational reliability, we also carry out maintenance tasks to the standard of the original equipment manufacturer. During the operational phase, we provide remote monitoring via a smart communication box.

Our partners

  • Hoymiles
125 kW
Performance
261 kWh
Capacity
Megújuló alapú, tárolós erőművi rendszer
Penny – Érd
About the project
Érd 2024
LFP PV

Our partners

  • Tecloman
60 kW
Performance
128 kWh
Capacity
Megújuló alapú, tárolós erőművi rendszer
About the project
Balástya 2026
LFP PV

Our partners

  • Hoymiles
480 kW
Performance
1 204 kWh
Capacity
Megújuló alapú, tárolós erőművi rendszer
About the project
Balástya 2026
LFP PV

Our partners

  • Hoymiles
480 kW
Performance
1 204 kWh
Capacity
Megújuló alapú, tárolós erőművi rendszer
About the project
Budapest 2026
LFP PV

Our partners

  • BYD
  • NR Electric
3 500 kW
Performance
6 022 kWh
Capacity
Megújuló alapú, tárolós erőművi rendszer
About the project
Budapest 2026
LFP PV

Our partners

  • BYD
  • NR Electric
2 500 kW
Performance
4 014 kWh
Capacity
Megújuló alapú, tárolós erőművi rendszer
About the project
Tiszaújváros 2026
LFP PV

Our partners

  • BYD
  • NR Electric
20 000 kW
Performance
32 115 kWh
Capacity
Megújuló alapú, tárolós erőművi rendszer
About the project
Létavértes 2026
LFP PV

Our partners

  • BYD
  • NR Electric
5 000 kW
Performance
21 460 kWh
Capacity
Megújuló alapú, tárolós erőművi rendszer
About the project
Berettyóújfalu 2026
LFP PV

Our partners

  • BYD
  • NR Electric
3 500 kW
Performance
15 022 kWh
Capacity
Megújuló alapú, tárolós erőművi rendszer
About the project
Kunszentmárton 2026
LFP PV

Our partners

  • BYD
  • NR Electric
5 000 kW
Performance
21 460 kWh
Capacity
Megújuló alapú, tárolós erőművi rendszer
About the project
Kunszentmárton 2026
LFP PV

Our partners

  • BYD
  • NR Electric
5 000 kW
Performance
17 168 kWh
Capacity
Megújuló alapú, tárolós erőművi rendszer
About the project
Kaposvár 2027
LFP Gas engine PV

Our partners

  • BYD
  • NR Electric
5 000 kW
Performance
25 752 kWh
Capacity
Megújuló alapú, tárolós erőművi rendszer
About the project
Mezőcsát 2026
LFP PV

Our partners

  • BYD
  • NR Electric
25 000 kW
Performance
45 162 kWh
Capacity
Megújuló alapú, tárolós erőművi rendszer
Mester Irodaház
About the project
Budapest 2024
SiB Other PV
  • Total 165 kWp DC solar capacity.
  • The solar power system installed on the roof of the office building is designed to generate the green energy required for the facility’s operations on-site.
  • 3 x 50 kWp Huawei inverters.
  • Smart electric vehicle charging system with 8 x 22 kW units.
  • Installation and programming of a smart communication expansion module.
  • Location: KÉSZ Group’s office building in Budapest.

Our Activities

As a first step, we validated the investment based on our energy and economic analysis. During project implementation, we manage the procurement and delivery of key technological equipment, system design, permitting, construction, and full-scale commissioning, as well as the integration of control systems. Furthermore, to ensure long-term operational reliability, we carry out maintenance tasks to the standard of the original equipment manufacturer. During the operational phase, we provide remote monitoring via a smart communication box.

150 kW
Performance

Testimonials

“The decision to choose GNX Engineering was driven by the team’s exceptional technical expertise, precise plans, and their ability to provide immediate, clear answers to any questions. It was particularly impressive that this high level of professionalism and client-focused attitude did not end with the signing of the contract; rather, it remained fully evident throughout the execution phase and in the final outcome. They delivered on every promise at every stage—and, thanks to their flexibility, often provided support that went well beyond their initial commitments. Communication and collaboration remained exceptionally smooth and efficient throughout the entire process. We especially value the fact that, even after the project’s completion, they continue to stand by us as true partners whenever professional questions or consultations arise—even in instances where they derive no direct commercial benefit. ”
Read more
Szilárd Korhetz